Guide with complete solution lifecycle from development through production deployment.

How-to Solution Lifecycle | Concept | How-to Guide | Reference


Overview

This guide walks you through the complete solution lifecycle from development through production deployment. Learn to manage versions, migrate between environments, and maintain solution integrity across all stages.

Prerequisites:

Table of Contents
maxLevel2
minLevel2
excludeOverview
stylenone
classon-this-page
printablefalse


Solution Lifecycle Overview

Configuration and Execution Environments

The Three Workspaces


Solution Center   →
  • Create/Manage
  • License
  • Launch




Designer         →
  • Configure
  • Build
  • Test



Runtime
  • Execute
  • Monitor
  • Operate





Solution Configuration  
     Database (.dbsln)

The Execution Profiles Stages

Development     →
  • Create
  • Configure
  • Debug
Validation        →
  • Test
  • Configure
  • Validate
Production      
  • Deploy
  • Monitor
  • Maintain

Development Stage

Initial Development

Creating the solution:

  1. Solution Center → New Solution
  2. Select appropriate template
  3. Configure in Designer
  4. Use Development profile

Development environment characteristics:

  • Local SQLite databases
  • Full diagnostic logging
  • Simulation data enabled
  • Unrestricted editing
  • Test mode available

Development Workflow

  1. Configure modules progressively:
    • Define tags and templates
    • Setup device connections
    • Create displays
    • Add business logic
  2. Test incrementally:
    • Use Test Mode (F5)
    • Verify each module
    • Check integrations
    • Monitor performance
  3. Version control:
    • Regular backups
    • Track changes
    • Document modifications
    • Tag development versions

Development Sprint Planning

Organize work in sprints:

  • Sprint 1: UNS Foundation (P1)
  • Sprint 2: Process Modules (P2)
  • Sprint 3: Application Modules (P3)
  • Sprint 4: User Interface (P4)
  • Sprint 5: Integration & Testing

Validation Stage

Moving to Validation

Preparation steps:

  1. Complete development features
  2. Build solution (F6)
  3. Export/backup development version
  4. Create validation environment

Validation profile setup:

Panel

Database: Test SQL Server
Historian: Limited retention
Security: Test credentials
Clients: Limited access

Validation Testing

Functional testing:

  • All features work as designed
  • Data flows correctly
  • Alarms trigger properly
  • Reports generate accurately

Performance testing:

  • Load testing with real data volumes
  • Stress testing communications
  • Client connection limits
  • Resource utilization

Integration testing:

  • External system connections
  • Database operations
  • Third-party interfaces
  • Redundancy failover

Testing Levels

  • Unit Testing - Individual components
  • Integration Testing - Module interactions
  • System Testing - Complete solution
  • Acceptance Testing - Business requirements

Validation Checklist

? All modules configured ? Scripts compile without errors ? Displays render correctly ? Communications stable ? Alarms functioning ? Historical data recording ? Security implemented ? Performance acceptable

Production Stage

Production Deployment

Pre-deployment:

  1. Complete validation sign-off
  2. Create production backup
  3. Document configuration
  4. Prepare rollback plan

Deployment steps:

Publish solution:Runtime → Publish Version: 1.0.0 Type: Read-only (.dbrun
)
  • Transfer to production:
    • Copy .dbrun file
    • Install on production server
    • Configure production profile
  • Production profile:
    Database: Production SQL
    Historian: Full retention
    Security: Active Directory
    Redundancy: Enabled
  • Production Startup

    1. Stop any running solutions
    2. Load production solution
    3. Select Production profile
    4. Start with monitoring
    5. Verify all modules active
    6. Check client connections
    7. Confirm data flow

    Version Management

    Version Numbering

    Standard format: Major.Minor.Build

    • Major: Significant changes
    • Minor: Feature additions
    • Build: Bug fixes

    Example progression:

    1.0.0 - Initial production
    1.1.0 - Added reporting module
    1.1.1 - Fixed alarm bug
    2.0.0 - Major upgrade

    Creating Versions

    Development versions:

    • Auto-increment build number
    • Tag with date/time
    • Include developer notes

    Production versions:

    1. Go to Runtime → Publish
    2. Set version number
    3. Add release notes
    4. Create .dbrun file
    5. Archive with documentation

    Migration Procedures

    Development to Validation

    1. Export from Development:
      • Build solution
      • Create backup
      • Document changes
    2. Import to Validation:
      • Load in test environment
      • Switch to Validation profile
      • Update connection strings
      • Test all functions

    Validation to Production

    1. Prepare solution:
      • Final build
      • Publish read-only
      • Create deployment package
    2. Deploy to production:
      • Schedule maintenance window
      • Backup current production
      • Install new version
      • Verify operation
      • Monitor closely

    Rollback Procedures

    If issues occur:

    1. Stop current solution
    2. Load previous .dbrun
    3. Start with last known good
    4. Investigate issues offline
    5. Plan corrective action

    Backup and Recovery

    Backup Strategy

    Development backups:

    • Daily automatic
    • Before major changes
    • Keep 30 days

    Production backups:

    • Continuous replication
    • Daily full backup
    • Weekly archives
    • Monthly long-term

    Backup Methods

    Manual backup:

    1. Solution Center → Select solution
    2. File → Export → Backup
    3. Choose location
    4. Include resources

    Automatic backup:

    batch

    TBackup.exe /solution:"Production" /output:"D:\Backups" /daily

    Recovery Procedures

    From backup:

    1. Solution Center → Import
    2. Select .dbback file
    3. Choose restore location
    4. Verify integrity
    5. Update configuration

    From published version:

    1. Locate .dbrun file
    2. Copy to production
    3. Start with profile
    4. Verify operation

    Change Management

    Change Control Process

    1. Request: Document change need
    2. Review: Assess impact
    3. Approve: Get authorization
    4. Implement: Make change in Dev
    5. Test: Validate in Test
    6. Deploy: Move to Production
    7. Verify: Confirm operation

    Online Changes

    Changes safe for production:

    • Tag value modifications
    • Display updates
    • Report adjustments
    • User permissions

    Changes requiring restart:

    • Device configurations
    • Database connections
    • Module additions
    • Port changes

    Change Documentation

    Track for each change:

    • Date and time
    • Person responsible
    • Modules affected
    • Reason for change
    • Test results
    • Rollback plan

    Best Practices

    Development Phase

    (tick) Use meaningful naming conventions

    (tick) Comment complex logic

    (tick) Test edge cases

    (tick) Document assumptions

    (tick) Regular commits

    Validation Phase

    (tick) Test with production data volumes

    (tick) Verify all integrations

    (tick) Check error handling

    (tick) Validate performance

    (tick) Document test results

    Production Phase

    (tick) Monitor continuously

    (tick) Maintain change log

    (tick) Regular backups

    (tick) Plan maintenance windows

    (tick) Keep documentation current

    General Guidelines

    (tick) Never edit production directly

    (tick) Always have rollback plan

    (tick) Test changes thoroughly

    (tick) Document everything

    (tick) Maintain version history

    This guide covered the complete solution lifecycle from initial development through production deployment, including version management, migration procedures, and best practices for maintaining solution integrity throughout all stages.